Solution · Cafés & Chains

Bar tools that survive a double shift — and match across sites

For café groups, roastery chains and hospitality procurement: consistent specs across every location, drop-tested durability, and re-orders that match the original delivery.

Where Hospitality Buyers Get Hurt

Three problems that show up on the bar, not in the offer

PAIN 01

Fit drift between sites

Site B's portafilter doesn't seat like site A's. Baristas improvise, extraction varies, and the coffee tastes different across your own brand.

PAIN 02

Handles that fail in month four

Consumer-grade materials don't survive constant use and commercial dishwasher cycles. Replacement cost quietly exceeds the original saving.

PAIN 03

No spare-part logic

A single broken basket means buying a whole assembly, because nobody specified the parts separately at purchase.

What We Do Instead

Specified once, delivered identically every time

Machine compatibility51 / 53.3 / 58 / 58.5 mm across Breville, Gaggia, Rancilio and E61 platforms. Send us your machine list and we confirm fit in writing before production.
Commercial-grade materials304 stainless steel, food-contact compliant, rated for repeated commercial washing. Finish options hold up under daily bar use.
Spec lock per siteCalibration force, diameter, tolerance and finish recorded on a signed spec sheet. Every re-order is checked against it, so site nine matches site one.
Consumable planningWear parts (screens, baskets, seals, brushes) are quoted as separate line items, so you can hold spares without re-buying assemblies.

See Certificates & Test Reports

Standard Bar Kit

What a typical site orders

Scaled by number of sites. Send your machine inventory and headcount per location and we'll cost the rollout.

ItemSpecificationRole
Coffee TampersCalibrated 20–30 lb, 58 mmConsistent extraction
Portafilters & BasketsBottomless + spouted, per machineFit and workflow
Puck Screens58.5 mm, 150 μmCleaner group heads
Milk Pitchers350 / 600 / 900 ml, 304 SSService speed
Bar Tool Sets & StorageMat, holder, funnel, knock boxStation hygiene

All figures above are indicative starting points. Final MOQ, lead time and tooling terms are confirmed in writing per project.

Next Step

Send your machine list and site count

We'll confirm compatibility, quote the rollout and propose a spare-parts schedule that matches your opening plan.

Request a Quote